Thames Water Adoption Agreement

Before we begin work, we will meet with the developer and the ground worker to discuss proposed resources, local practices, specific design elements, the work program and the adoption process. While they meet the standards of other water companies, remember to follow our local practices, including stimulating facilities and facilities. The water code was approved by Ofwat on September 3, 2020. The approved sentence of the documents is shown below. Independent bodies have been set up to make recommendations on proposals to amend standard documentation for adoption. More details can be found below. What information does an application need? Obviously, the form contains the basics of the site, the developer and all other parties to the Section 104 agreement, as well as the relevant planning conditions, the number of properties, the initial occupancy date and other standard details. All treatment plants must meet strict design, environmental and regulatory requirements, as well as requirements set by the Environment Agency. This can make the introduction of treatment plants a time-consuming and costly process. We advise you to visit us to discuss your plans before applying. As a general rule, the cost of applying for a sewerage system in Section 104 includes an amount to cover technical and audit services, legal fees and security deposit. Currently, for the sanitation services we are dealing with in Essex, Suffolk, Hertfordshire, Kent, Cambridgeshire and London, one of the requirements of the Code ofwat for adoption agreements is that all applications for amendments to Ofwat-approved documents be submitted to an independent body made up of an equal number of water companies and customers. The role of the body is to make recommendations to the Ofwat if it believes that changes to approved documentation are appropriate.

The new Adoption Code recommends that you do not create new assets that we wish to take over until all parties have signed the legal agreement in accordance with Section 104. A Section 104 sewer disposal application must be made before your drainage company can begin building a new canal, so the local sanitation authority will agree to take over the newly constructed new private canal (or pumping station) as soon as the work is completed. This means that they will keep it at their own expense in the future. To apply for the introduction of sewers S104, you must deliver: the new sewer acceptance scheme came into effect on April 1, 2020. If you want to start your development, but you don`t yet have a full technical check or agreement signed in accordance with section 104, you need to request an early start. In accordance with Ofwats` adoption code, we need to understand your plans before we can confirm the acceptance of your proposals, which means you need to have technical drawings, drawings and more at your fingertips. Download information about our needs. Before we finish the job: We will complete a final inspection to sign the work for the future Vesting. . If you have an existing private sanitation system or pumping station that has been in operation for at least 12 months, you can ask us to accept it in accordance with Section 102 of the Water Industry Act 1991.

If you wish to contact the sewers, you can do so at this address: if you apply under Section 104, you must provide detailed information about the design and construction of the new canal and how it is connected to public sewers. The sanitation authority will need it to verify that the work is being carried out in accordance with the sewerage sector guideline (SSG- which replaced the « sewers for adoption » in April 2020).

Posted in Non classé |